What is the Procedure for selecting a Cable, Breaker and
Transformer for particular load.
Answer Posted / anuj
mostly cable size is selected according to the load equipments,it is depend on the equipments, if my equipments is three phase ,so the current is difference from the single phase equipments,in a three phase circuit , 1 mm2 three core copper cable rating 4-5 amp.,and aluminium cable is taking only 2-3 amp. only.temperature of the atmosphere where we use it, is very important for the right cable selection
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
how to calculate fault level?
WHAT R THE SAFETIES IN A HIGH TENSION PANEL N LOW TENSION PANEL. ALSO WAT SAFETIES R THERE IN A 200 KVA TRANSFORMER?
sent to a site and asked to explain how you would like a twenty seven flour building should be supplied with lighting and sockets plus a water boiler.
I am applying for NTPC examination.Can we please provide previous paper to my mail prasad.chintala108340@gmail.com
Explain Random and Deterministic signals?
a battery is having capacity 100AH and 25% charging .if a load taking 10A & connected 6 hour .what is the final condition of the battery.
how to check three phase motor torque value?
What is the difference between AC and DC injection methods for rotor earth fault protection
What are the advantage of free wheeling diode in a full wave rectifier?
I have a small system with two motors that are running on 380 vac, 60 hz. These motors are expensive and I usally get them from Brazil. I am adding another motor to the system, but I want to purchase a 480 vac, 60 hz motor to use. It will be on a VFD that is rated fro 380 thru 480. Is this posible and will I have to use a larger motor and derate it?
Define peak time.
what precautions to be taken while desigining a LT,HT panel. Eg-LT panel PCC panel with ACB installed. HT panel VCB panel with VCB installed. & what is main diffrence betwn IP54 & IP55 construction of panel.
what is the common earth
A double circuit with dog conductor 66KV Transmission line from wind farm evacuation to feeding substation having capacity of 25MW for transmission. Can same transmission network be considered for further expansion of Power & how much in MW. If we need to expand next 10-15 MW more will there any augmentation is required in transmission network? Kindly reply asap.
what will happen if the prime mover on the field excitation of the on-coming generator fails?Explain.