What is the difference between auto & dumpy level
Answer Posted / shekhar257
You have to centre & level the Dumpy Level using the screws
while Auto Level automatcally levels itself.
| Is This Answer Correct ? | 20 Yes | 17 No |
Post New Answer View All Answers
How to calculate construction cost of residential building in mumbai
how to calculate the crushing strength of cement concrete paver blocks 100x100x60 mm thich.
Time required for curing of wall tiles before fixing
A Cat excavator loader of 3Lm*3 heaped capacity bucket is to be used to load blasted rock directly into a crusher of capacity (consumption) of 100L
how to design and calculate materail quantity for concrete speedbreaker ?
Minimum concrete cover in slabs, columns, beams, foundation and other st?
what are the grades of concrete?where and or what purpose a particular grade is used in a particular structure?
what is the dimensions of river sand truck trailer or trolly ?
The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.
how to find ssm in foundation?
can i get hindi version of is codes based on civil engineering?
rimmer in pile foundation
hi every body..i have applied for RRB section engineers CIVIL.i wanna prepare for that,so can any one suggest me some books and where can i get the syllabus for this..i would be vry greatful if any one can help in this regard
the distrubution system in water supplies is designed on the basis of avg daily demand peak hourly demand coincident of draft greater of B & C
how do we calculate quantity of cement sand and aggregates in 1m3 of m20 m25 grade concrete?