Answer Posted / k.krishnaveni
Portland Pozzolana Cement
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
according to the painting co efficient, we should take the one side of doors (or) windows or both sides?
Special thing in designing a overhead reservoir ? which is different from an ordinary design
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
what is the weight of 10mm,20mm,40mm aggregate
how to conversation of all construction material in to brass
hoe much fine & sourse agregate required for concrete mix of 1: 1.5:3 by volume in Cu.Ft
Draw a neat sketch showing the 'throat' of a welding in a plate girder ?
strength of bitumen concrete with 80-100 & 60-70 grade bitumen
PCC Road Min Grade M 30 for VR standard Mahatashtra load 30 KN. what should be thickness of pavement, width 4m what should be length of panel.
What are advancements in civil engineering?
what is meant by sustainable developement as far construction field is considered. Give suitable examples to explain the same
how to calculate detail quantity of bricks and mortar for 500 cu.ft masonry work. consider wall thickness 9 inches
Explain major difference between auto level and dumpy level?
sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience
how much of the strength comes from post-production curing