HOW TO FIND OUT THE QUANTITY OF CONCREATE
Answer Posted / shahnawaz
simply find out the volume of concreting area i;e LXBXH
orD=we will get the volume say cum (m3)
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
what is project?
if i have to draw bending moment diagram of 4 way continous span then how to create it and how to find reaction?
How will drive weight formula for circular cylinder steel bar in kg/ m please step by step drive?
what is c4x light weight cement blocks
how many litres of enamel paint required for 5000 sft of site??
What is the difference between 53 grade and 43 grade cement
To pcc 11 ft x 24 ft .How many bags of cement, sand and aggregate required? And for roofing how many cgi sheets required?
How to calculate 1 brss for RCC work
What are the types of slump?
mix design procedure for 1:6 cement mortar
Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.
When was the first motorway built in england?
How much Tolerance factors like 1. brick work 2.plaster 3.painting 4.floor tiling 5.wall tiling 6.shuttering 7.concreting 8.steel
Is there the dry coefficient of cement is constant?
what is the types of surveying?which type of survey carrying for type of work?