what we execute firstly wall tile or floor tile?
Answer Posted / mr.sagar .y. bothare
CEMENT MORTOR IS APPLIED ON THE WALL SURFACE. THEN TILE IS
SUBMERGE IN TO THE WATER UPTO 1 HOUR . THEN THIS TILE
SHOULD BE FIX TO THE WALL
THIS IS PROCEDURE TO FIX THE TILE.
| Is This Answer Correct ? | 0 Yes | 3 No |
Post New Answer View All Answers
In case if concrete box girder bridges how is the number of cells determined?
how much of the strength comes from post-production curing
Define What are the uses of Groynes?
insted of bentonite we can use any alternate material in piling ?
What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.
What is the number of IS code of practice to be followed for hydraulic design of sewerage pipe line?
how many sqft or cft of work done by a mason per day in all works such as brick,block,concrete,shuttering carpenter,reinforcement fabricator,painter,door window carpenter.....everything thank you
how many mason and labaur work for a 1 brass bricks plz let me know the calculate & how to made calculation for this and whats the formulas for this?
How do you determine specific gravity of cement?
Explain how you can use different dimension tools in CAD? What are the different dimensions available?
How much cement is require in one sqft area in a G+3 residential construction.
To pcc 11 ft x 24 ft .How many bags of cement, sand and aggregate required? And for roofing how many cgi sheets required?
How to arrive d*d/162 , for finding the kg per meter , wt of steel
How much time Required for PPR pipe network testing
what is meant by shear center?????