Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what we execute firstly wall tile or floor tile?

Answer Posted / mr.sagar .y. bothare

CEMENT MORTOR IS APPLIED ON THE WALL SURFACE. THEN TILE IS
SUBMERGE IN TO THE WATER UPTO 1 HOUR . THEN THIS TILE
SHOULD BE FIX TO THE WALL
THIS IS PROCEDURE TO FIX THE TILE.

Is This Answer Correct ?    0 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the strongest bridge for a school contest?

1183


What are the advantages and disadvantages of lead products in construction?

1200


as per is code, what is the minimum content of opc and ppc cement for rcc structure

2277


IS STEEL BARS IS AS PER ISI TRANSVERSE RIBS SHOULD BE UNIFORM IN DISTANCE, PLEASE EXPLAIN WHY,

2311


How do you calculate load bearing capacity of a waffle slab?

2696


How to calculate concret slab? W l t(4mts*5*2fts) ratio m25 grade pls tell me procedure

2239


What is the density of 1:1.5 (Cement:sand) ratio in plaster? And Conversion in 12.5 mm thickness per square meter? Howmany Kg of Cement square meter in ratio of 1:1.5?

3350


How can we demolish concrete beams?

2345


i want texture painting pwd data

2081


How to do base isolation for RC framed structure using ETABS software?

4200


Define a polyline?

1249


what is the breaking strength of wall tiles

2517


How much area will be covered in 1 litre of Velvet touch paint in normal wall condition

1434


In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.

2276


how to caluclate sienerge qty in construction in ap

2446