Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

A 150KW 440V motor is need to replace in the field instead
of faulty one. what are the main parameter should I need to
check?

Answer Posted / a.p.nanjappa

150kw , 440 is a large motr. the starting current of this
induction motor will be 5-8 times depend on drive ex-fan.
and coast for 6-8s to attain full speed.
so, the new contactor shall be good quality , with
overload,instantaneous with time delay shall be selected.
Reverse rotation protection, vibrations,
Unbalnced current protection optional.
LV power cable terminal box cable connection and support.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the formula to calculate the size of Aluminium and copper cable?

1966


How the annunciator works ? How to do its wiring

2307


what is the minimum recommended leakage current of an earthed cable connected to the body or skid of an alternator

2064


which type of effect of turbine and generator reverse power protection ?

4197


we are going to install a solar PV site and how can we calculate PV Solar Panel Efficiency, can anybody tell me complete method for its calculation.

2135


what is meant by impulse voltage?

2017


Why mostly the HV side of transformer has Delta?

3230


SIR, GIVE ME OPGW SAG CALCULATION FORMULA I AM DAE ELECTRICAL. THANKS

6851


why do we carry out winding resistance test?

2298


What is installed in PAC that is control the humidity

1521


why would amp draw on neutral wire be as much as amp draw on the hot leg.

2094


how to calculate compresor capacity?

2200


While testing LA mast,What are the parameter limits ?

1917


sir please send me techinical questions for junior engineer posting in bangalore railway i am diploma holder

2109


I want definition for ABT Meter (Availability Based tariff) ?

2016