How to test and satisfy the conditions of the vector group
YNd1 for power transformer?
Answer Posted / a.p.nanjappa
THIS IS ONE OF THE MANUFACTURER TEST OF VECTOR GROUP.
IN THIS TEST , THE HV RPh or Uph is connected to low voltage
rPh. /uPh. then 400v 3ph is applied. various voltage are
measured. (RS,ST,TR, R-N,S-N.T-N, r-s,s-t,t-r, r-N,s-n,t-n.
then, draw the graph,
refer to electrical hand book-transformer, any text book
also,manufacturer test report
| Is This Answer Correct ? | 3 Yes | 5 No |
Post New Answer View All Answers
hi friends i m from electrical branch and seeking for tech. + apti. both papers of hpcl plz get it available as soon as possible
Which power will flow first if we switch on a motor Active or Reactive? How?
if we install two earth pits with a clear space of 5m without any interconnection,by checking the digital multimeter will it show continuity between earth pits? If so what would be the approx. value
What is resolver and glass scale in CNC how they work?
What is Faraday's law
if i am in front of transmission line how to know that current direction without any equipment
What is servo motor? what is its purpose?
How many types of faults are there in 3 phase power system?
what type questions asked in hp cl
what is the use of the circle diagram
why does rotor rotets?
how can maintain the power factor and why and this is how do work tell us
Where is the best place to mount distribution panel in a house.
what rectifiers is and what are the types of rectifiers?
A 100KVA SINGLE PHASE TRANSFORMER 10000/200V,50HZ REQUIRES 300V AT HV SIDE TO CIRCULATE FULL LOAD CURRENT WITH LV SHORT CIRCUITED.THE INTAKE IS 1000W.THE % OF REGULATION ON FULL LOAD AT 0.8 PF LAGGING WILL BE HOW MUCH AND THE SECONDARY TERMINAL VOLTAGE ON 0.8 PF LEADING WILL BE