Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

lap lenth

Answer Posted / subhasis1991

Its kind of length to be embeded inside some support like column or something.its calculated using IS 456 :2000
Page 42. 26.2.1

Now description of the equation is probably as follows..
let dia of a bar is = d; tensile strength = s;and shear strength is =t;and length embeded in a wall is Ld;;;;
So to keep the bar to resist from sleeping from support
upto it's tensile strength the condion would be
(Ld*(pai*d))*t=s*((pai*d^2)/4) => Ld=(d*s)/(4*t)...

Is This Answer Correct ?    3 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the basic difference between OPC

2044


asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream

1931


What is the tensile strength of marble?

1148


How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?

4990


Define absolute co-ordinates?

1289


How much does it cost for a R.C.C cover slab of size (450mmX 600mmx 100mm) double rf net given in feets using hand mix concrete?

1888


can you give me the details of rate analysis of steel and concrete?

2973


Define What is the tensile strength of wood?

1118


how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?

1669


The definition of national highway

1808


As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.

1949


give me the mix proportion for design mix concrete M 7.5 grade 1:4:8

4021


what values & beliefs have guided you in your career path

3279


What is the substitute of Mastic Asphalt?

8098


what is the calculation of raw material for 0.35cum of m-15

1449