what we execute firstly wall tile or floor tile?
Answer Posted / harikirangowda
plastering should be competed from bottom to top except
skirting area bcz flooring have to complete before skirting ,,
| Is This Answer Correct ? | 4 Yes | 2 No |
Post New Answer View All Answers
04. a. Slenderness ratio…………… 1 b. If the height of a stage is 15-0 & dia. of the prop is 5, the slenderness ratio is….… 1 c. If the height of a stage is 10-0 & dia of prop is 3, the number of bracing will be…… 1
what is the difference between replacement of cement by groundnut shell ash
what is project?
why we are useing plastic under the lean concrete?and whts the advantage?
Anyone have sample questions for bhel interview.please send me as Iam appearing for the interview on 19th sep2008. Kindly send this to my e-mail: arun_prasath_n@yahoo.co.in
what is the name of shuttering oil used in oman
what does the track parameter mean in staad.pro?
The internal dimensions of a wire house 15m*5.6m and the maximum height of piles is 2.70m. What is the maximum number of bags to be stored in two piles ?
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
What are some structures that may be subjected to fatigue?
may i know the detailed description of cutting length
Define What is rigging?
WHAT IS THE CAUSES OF RUTTING ON FLEXIBLE PAVEMENT?
How to calculate material and labor required for 100 m2 plaster?
hoe much fine & sourse agregate required for concrete mix of 1: 1.5:3 by volume in Cu.Ft