we calibrate HPLC once in 6 months while iam doing
calibration i came to know that calibration was failed.
then how can i justify that the samples analyzed on the
system during this 6 months was wright? how can i forward in
to the next step for those batches?
Answer Posted / pankaj punjabi
After 6 month calibration is failed,So you have to
reanalyse the previous batches which is analyse for last 6
month.and comapre the results.then only it is justified.
| Is This Answer Correct ? | 2 Yes | 16 No |
Post New Answer View All Answers
which batch require to use for analytical method validation?
What is dose dumping? why require to do?
Why a1% value is used for some product ? What is the criteria for selection a1% value ?
EXPLAIN THE CALCULATION PART OF AN KF TITRATOR CALIBRATION WITH SUITABLE EXAMPLE
Identify problem faced when mass spectroscopy is used with HPLC system ?
how you start the solubility study?
What is the difference between purge septum flow and column flow in gas chromatography?
What are usp limits for theoritical plats,resoution,tailing factor,peak to valley ratio
before starting analytical method valodation what you checking? and how giving preference to start validation?
on saturation solubility study data how we can find out the bcs class of drug?
in api coa contains only process impurities and in product coa contains degradation impurities?
how to develop the icp ms method? Application of icp ms?
What if impurity area in control sample coming more as compared to LOQ level of impurity ?
in sampling of raw material which side is pasted sampled labels
Why irmoisture balance is used for corrugated box moisture testing