Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How to check loadcell working or notworking

Answer Posted / suman chakraborty

First you need to check the excitation voltage which is feed from the controller part then see the mile volt from the load cell side,Then according to the change the load if the voltage changes then primarily the load cell is okay.

Is This Answer Correct ?    11 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How many are the types of instrument cables in terms of No. of pair.

2146


Why upper weighing limit of electronics balance is 90% of the total weighing capacity?

2124


1. what is modbus cable? 2. what kind of communication we are using for the interface of DCS, ESD and Third party cabinets? 3. What is serial communication and peer to peer communication?

2132


hi my name is rakesh patel i just complited my be in instrumentation & control now i am going to working as a validation engineer in a poject department so what is a scope in a future as a validation engginer ? what line is good for me can any bady give me complete solution please? your regard rakesh patel

1920


What is the purpose of LO Overhead tank in turbines.

1949


Working principle of magnetic flow meter ......and calibration procedure of e+h magnetic flowmeter...

2295


Which type of pressure can be measured by these elements?

1090


Why MUX JB's are using only Temperature Element in Fundation field bus?

2263


describe flow nozzel principle?

2465


Can anyone send most commonly asked interview question in Oil & Gas industry

2189


A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.

2114


How it the difference between force balance system and dispalacement balance system?

2048


In VVVF DRIVES VOLTAGE IS ALSO VARY WITH THE FREQUENCY. HOW? WHAT IS THE DIRECT FORMULA RELATING THESE TWO.

2312


How we can check the 2 wire proxy switch? & how it is connected to DI MODULE OF PLC?

2546


Give 2 application of quartz crystal used for process parameter measurement.

1972