What is Diff btw MCP & MCB????
Answer Posted / bhawna tiwari
MCP - manual call point, is an alarm system which is used
in case of fire or any emergency.
MCB - Miniature Circuit breaker is used an a trip system to
protect the entire electricity points.
| Is This Answer Correct ? | 10 Yes | 3 No |
Post New Answer View All Answers
What is precision of a measurement?
Why choke coil is connected in series with starter in tubelight??why starter is connected in parallel to tubelight??
Hi, This is Laila. I am selected for syndicate bank interview. Could you please share your views and the questions asked if you have faced the interview My email id is laila_honey09@yahoo.com Please send as fast as u can.Thank You Thanks... Laila.
I HAVE A INCOMING 100A MCCB TPN 25KA, CABLE LENGHT OF 80M 70MM CABLE SIZE FROM MAIN SUBBOARD TO NEW DB.BASE ON THE FAULT LEVEL SETTING OF 45KA.I WOULD LIKE TO FIND OUT 25KA ENOUGH KA. APPRECIATE IF SOMEBODY CAN ASSIST ME WITH FORMULA FOR THIS. FRM: JEFF
how to select energy meter? have any calculation?
what is the generator rating for 40 amp load of 3phase motor.?? 400v voltage of generator... plz tell me with formula its urgent...plzzz... and also tell me that this 40 amp at all phases mean 40 amp on red,40 amp on yellow,40 amp on blue...... or the total sum of that 3phase is 40 amp....
what is calculation mathod/formaulla for deciding Size of busbar (Copper/ aluminum)for L.T. panel on Various Fault level like 50kA,25kA,10kA
how is capacitor bank look like
Can anybody inform me about the pattern of ECIL GET( Graduate Engineers Trainee) interview for Electrical students? Will there be HR round as well? I thought of preparing for 2 to 3 subjects thoroughly. Will it be sufficient? Please share your thoughts.
what is the IEC standard for Power Cable installation in onshore (like in direct buried ground or above groung)
please send the last 5 years {{{JUNIOR ENGINEER - ELECTICAL, ELECTRONICS RRB CHENNAI and secundrabad}}} TECHNICAL question papers TO MY EMAIL ID dinesh100701@gmail.com
we have one oven for 12 zone we are installed ir lamp in oven we control load from thyrister and 0 to 5vdc so our zone no 8 getting bright in fraction of second so what we do.. Please answer
Why we use 4-20 mA Analog signal for the PLC input? Why not 0-20 mA? Why not 5-25 mA?
explain different losses in a transformer.
How does PLC work for sychronising of Two or more DG sets?