why cracks are being developed in a structure? any specific
reason? is there any remedial solution?
Answer Posted / mrdraj100
there is not any specific reasons for cracks: there are
variety of cracks that can occur in any structure (shear
cracks, flexural cracks)etc.....for these different cracks
there is different mechanism involved..for remedial solution
the reason behind the crack has to be found....
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
) Design a gussetted base for a column section consisting of one sc 250 with two cover plates 300 x 25 mm carrying an axial load of 2500 KN. The S.B.C. of soil is 250 KN/m2 and the permissible bearing pressure on concrete is 4000 KN.
what are the Task work of different labour.?
What are the problems one might face while having a Cantilever balcony?
how to calculate the steel in 500yard
how much quantity of cement,sand and water required for 1 sq feet flooring work .
What are the advantages of building a dam on the river nile?
I want to know the material required per Square foot in rcc roof i.e.Steel ,Cement,
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
Describe about the Pile test methods, which are used in Industrial & Multistory Buildings in general.
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
What is the snap size in civil and how can we create it?
Why joints are provided?
What is the quantity of cement in mix m20 concrete?
how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.
Which tests are performed on soil to decide the type of foundation to be provided.