why cracks are being developed in a structure? any specific
reason? is there any remedial solution?
Answer Posted / sagar bothare
CONTINOUS WATER SHOULD BE GIVIN TO RCC STRUCTURE. DURATION
ATLIST 7 DAYS
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.
what is the amount of absorption of slurry in shuttering ply board. what is the amount of slurry leakage allowed for 1 m3 of concrete.
Is it possible to make a feature using an overdefined sketch?
I am a civil engineering student and going to attend interview in this week in an IT company.Will they ask me questions about my area of interest or cs
What is Critical path in Ms-Project ?
what is work of planning deptt. in any construction compny (in road project)
what is the use if we fixed butterfly ties in column and masonry work joint?....where we have to fix(distance)..
what is the procedure of wet seiving. n percentage of silt in different type of soil?
Define What is the distance between railway tracks?
what is meaning of inverted beam.is it way to provide double mat in slab one at bottom and another at topif we go for provision of inverted beam. shall we construct structure with out plinth beam for us we have to construct small bus shelter
During reclamation how can the occurrence of mud waves can be rectified?
Mention what are the composition of a landfill?
Scaffolding IS code NO.
50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?
Bernaullis theorem deals with the law of conservation of mass momentum energy none