why cracks are being developed in a structure? any specific
reason? is there any remedial solution?
Answer Posted / sagar bothare
CONTINOUS WATER SHOULD BE GIVIN TO RCC STRUCTURE. DURATION
ATLIST 7 DAYS
Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
Different sizes of Hollow blocks and its weight. Thanks.
What is the compressive strength of fly ash bricks?
how can we calculate steel value, depending on load
HOW TO CLACULATE CEMENT AND SAND CONSUMPTION FOR THE STAIRCASE KOTA FLOORING IN THE RATIO OF 1:4 50 MM THICKNESS
Design a built-up column carrying an axial load of 1200 KN. Its length is 8m and it is effectively held in position at both ends and restrained against rotation at one end. Assume yield stress of 250 mpa
What is the diff b/w ROAD TUNNEL & RAILWAY TUNNEL ??
What is capicity of cap lock scffolding stander(vertical member) and ledger of different size?
qty. of cement & sand required (100sq.mtr) for fixing of floor and wall tiles also fixing of marble stone on the floor
what are the five benefits of using standard terminology in the measurement process?
for 200 kg of cement how is the mix proportion in kg for m25 grade of concrete
How much cum. Brick work can do by 1 madon
explain five benefits of using standard terminology in the measurement process?
what is the design procedure for building
What is Heavy Concrete & Normal Concrete
How to calculate material and labor required for 100 m2 plaster?