why cracks are being developed in a structure? any specific
reason? is there any remedial solution?

Answer Posted / sagar bothare

CONTINOUS WATER SHOULD BE GIVIN TO RCC STRUCTURE. DURATION
ATLIST 7 DAYS

Is This Answer Correct ?    0 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Different sizes of Hollow blocks and its weight. Thanks.

1929


What is the compressive strength of fly ash bricks?

698


how can we calculate steel value, depending on load

1759


HOW TO CLACULATE CEMENT AND SAND CONSUMPTION FOR THE STAIRCASE KOTA FLOORING IN THE RATIO OF 1:4 50 MM THICKNESS

4228


Design a built-up column carrying an axial load of 1200 KN. Its length is 8m and it is effectively held in position at both ends and restrained against rotation at one end. Assume yield stress of 250 mpa

1760






What is the diff b/w ROAD TUNNEL & RAILWAY TUNNEL ??

1952


What is capicity of cap lock scffolding stander(vertical member) and ledger of different size?

2115


qty. of cement & sand required (100sq.mtr) for fixing of floor and wall tiles also fixing of marble stone on the floor

1762


what are the five benefits of using standard terminology in the measurement process?

1670


for 200 kg of cement how is the mix proportion in kg for m25 grade of concrete

1485


How much cum. Brick work can do by 1 madon

1186


explain five benefits of using standard terminology in the measurement process?

1579


what is the design procedure for building

1769


What is Heavy Concrete & Normal Concrete

2237


How to calculate material and labor required for 100 m2 plaster?

1252