How to calculate the cement, sand quantity for plastering?
(10'x10')10mm thick ratio 1:5. wht"s the formula?
Answer Posted / bala ganesh
TOTAL QUANTITY OF PLASTERING=3.05*3.05*.01=.093 cu.m
by thumb rule
.75 cu.m of plastering requires =350kg of cement
1750 kg of sand for
the ratio of 1:5 (the weights are calculated with specific
gravities) from this
add 30% extra for wastage and uneveness=.121 cu.m
so for .121 cu.m of plaster requires = 56.5 kg of cement
282.5 kg of sand
| Is This Answer Correct ? | 16 Yes | 11 No |
Post New Answer View All Answers
give me the rate analysis for Bituminous Macadam and SDBC
what is the design procedure for building
What is Rankine Cycle?
Permissible wastage of cement as per IS code ? In which IS code I get it?
What is high adherence steel bar? I have a general specification which refers to High Adherence steel bars, coils and meshes to BS EN 10080 and BS 4449 or BS 4483. Is this just general re-bar or is there something different about it? The spec originated in France.
How much material is required for constructing a 2 Lane 2Km rigid pavement road
What is labor and material payment bond?
undistributed samples are obtained by
if i have to draw bending moment diagram of 4 way continous span then how to create it and how to find reaction?
What type of tensile strength is handling by crank in beam? Thanks.
how to estimate costing from quantity givin in BOQ and according to this how we fill tender and final rate for perticular work.....?
What Are The Different Type Of Slump Test Indications?
What is hybrid foundation?
How to do rate analysis for concrete work including shuttering work?
What is soil enforcement?