How do you derive the quantity of cement & sand in brick work
construction in 1Meter cube, using CM 1:6 and bricks of size
19*9*9 cm
Answer Posted / prakash
3/1+6=0.42 cum cement and 2.57cum sand required ,brick for 1
cm is 500 nos
| Is This Answer Correct ? | 2 Yes | 3 No |
Post New Answer View All Answers
Are cruise ships built for the transatlantic run?
I am in India. Employer A got approval for my H1. But they have no job for me now. Company B is going to file H1 for me. They do not know about company A. Is there any way that I get approved H1 of company A transferred to Company B?
How to design staircase.plz tell me formula for the design the staircase.
Minimum concrete cover in slabs, columns, beams, foundation and other st?
Design an underground tank of internal dimensions 6m x 3m x 3m. The soil surrounding the tank always remains dry. The tank shall be provided with a roof slab. The soil weighs 16000 N/m3 having an angle of repose of 30.
sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience
Why is the use of granular sub-base in concrete carriageways not preferred, explain?
punj loyed and sapurjl palanjl
how to caluclate sienerge qty in construction in ap
procedure for preliminary selection of size of column of 5 storey building
Define What are the uses of alloys in daily life and how are alloys made?
How to arrive dry volume of concrete (1.52 to 1.57) ?
How to calculate 1 brss for RCC work
TO CONSTRUCT A 1800 SQFT CAPACITY UNDERGROUND WATER TANK HOW MUCH CUFT CONCRETE IS REQUIRED AND HOW MUCH REINFORCEMENT IS REQUIRED. FOR COSTING
why we are useing plastic under the lean concrete?and whts the advantage?