how much steel is required for 1100 sqft of slab (area 25*43 )
& we need to consrtuct 3 floor
Answer Posted / bob
If you want to cover the whole slab use 1100 sq ft per
floor.
Is This Answer Correct ? | 11 Yes | 6 No |
Post New Answer View All Answers
I am architecture student. What type of foundation is preferred in Alluvial soil ? where the soil texture is sandy loam...and also which type of foundation is used for steel structure which will be for 6 story building design
what is the use of studing architecture
difference between action and collaboration in object oriented designing and modeling
what is the role of an architect
rate for 5" thk rcc slab using rebarring in pune
How to calculate stabilizer for a machine
what is the maximum depth at which the open foundation bridge can be done
how much steel required for 1 sq area for swimmin pool construcion
The telecommunications offered by the GSM PLMN may be divided into three main groups.what is it?
How did you decide to go into architecture and what did you do to prepare for this field of work?
give me details about EPBX system
What feature is unique to the Hagia Sophia?
How CPU handle an interrupt operations?
how do we calculate lux for museum building? what is the procedure?
how to know low voltage and high voltage ranges for electrical machinery ?