how amny bricks of size 240 mm X 120 mm X70 mm are required in
100 cubic meter brickwork. How much cement is required at 10
mm masonry and at 4:1 sand cement ratio and how much cubic
meter of sand is required for the above work.

Answer Posted / shyam sundar mondal

10mm th. with morter brick size=.25x.13x.08=.0026cum
volume of one brick with morter =.0026 cum
No of bricks one cum brick work = 1/.0026=385 nos
volume of one brick without morter = .24X.12X.07=.002016 cum
volume of morter =.0026*385-.002016*385 cum =.000584*385 cum
=.22484 cum
Dry volume of morter =1.20x.22484 =.2698 cum
Cement required = .2698/5=.05396/.0347*50=78kg
sand required = .2698/5*4=.05396*4 = 0.2158 cum

Is This Answer Correct ?    4 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

questions with answers to face an interview of an civil engineer regarding RCC buidings

2169


what is the venturi effect in buildings? what is green house concept?different types of dams? which dam is economical arch dam or gravity dam. what are the conditions favourible to both of them?

2637


why is the column design?

1837


how many litres of enamel paint required for 5000 sft of site?? 

1490


What are the different methods for drawing an arc?

710






What is the snap size in civil and how can we create it?

2311


how to calculate the crushing strength of cement concrete paver blocks 100x100x60 mm thich.

1506


What is a kip?

729


i have a interlock pavement work.i need to compact about 2000 sq metres of sub base grade c of thickness 15 cm.what is the amount of water required for compaction ??

1648


I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

1649


what is difference between NP2 NP3 NP4 CONCRETE HUME PIPES USED AT SITE

3603


If we are providing concrete joint in every 10m with water stopper in water tank wall then is it necessary to cut the steel at joint section?

1388


in one hour , one 200 excavator , how much quantity (mcube)can load ? soil is not hard not soft

1511


what is c4x light weight cement blocks

5159


pls tell estimate for 1 kilometre length random rubble masonry 0.90 metre height 0.600 metre width

1116