Answer Posted / razif mat saat
Most likely the misspelled "Megger". Megger is a company whose Insulation Resistance meter is so well known; people usually associates any insulation resistance meter as 'megger tester'.
| Is This Answer Correct ? | 10 Yes | 8 No |
Post New Answer View All Answers
how many synchronous motor are there in any power plant
plz tell me,ht and lt panel terminals in substations explain beiefly
How to calculate cable size in HT AND LT
Differentiate between Zero and Negative sequence current
how to avoid electrical shock how capacitor store charges wat are the speed control of induction motors state faradays law flemings left hand rule what is rotary converter wat is transmission and distribution what are the sources of energy abrevation of acb,vcb,sf6,igbt what is output equation of transformer which test copper iron and iron loss are calculated what is eddy current draw a single line diagram (10 marks) draw direct online starter(10 marks)
What type of core material is used for metering C.T and protection C.T???
why surge protectetor work explain with the help of circut diagram?
I WANT YHE TECHNICAL AND ELECTRICAL SPECIFICATIONS OF 2x4MW 11KV 2x10MW 11KV 2x25MW 11KV 2x100MW 11KV HYDEL POWER PLANT i.e PROTECTION SYSTEM,MONITORING,CONTROL SYSTEM,GENERATION,SYNCHRONISATION,METERING PLEASE SEND THE DETAILS TO MY MAIL ID SPRAVEEN_222@YAHOO.CO.IN
A 7 storey building has a floor area of 35,000sq.ft on each storey. On the ground floor 11KV electrical sub-station is to be erected. A load of 3kw for every 400sq.ft (p.f is 0.8) is proposed for each floor. fire pump 7.5hp, water pump 5hp, lift 2 nos, each 10hp and 20shop load of each shop is 5kw. calculate a. load each floor b. total load of building c. L.T feeders for aech floor and from transformer to main. d. distribution diagram e. capacity of sub-station/capacitor bank f. line diagram
what is model question rrb junior engineer electrical gr.II
relation between power station capacity and voltage level?
what is the sludge current
What is the meaning of floating point earthing in battery backed systems ?
I would like to know that the fault curretn at base load and at 10% generation will be same? Fault level of BUS remain same with different generation?
XYZ