If the load of transformer is getting more than its
rating,,,than how to overcome this problem? Suppose thee
rating of transformer is 315kva and the load is going
beyond than the rating say around load: 352kva...
Than how can we solve this problem without deducting the
load.
Answer Posted / ramesh rao
if it over loaded, oil get heat, oil vapour operate bucholz's relay to trip.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
what is resver in electrical enginnering with answer
i m doing DEEE in part time,can i join regular cources in BE,,IF i join what the cources can i select like (civil,ece,IT) ,,kindly advice
At the starting of dc motor and syn.motor and induction motor high current flowing through the winding. Due to this the windings burnt out. To avoid this different types of starters are used. But incase of transformer what Will be used (At starting no emf is induced in the primary winding)?
What is power in wattage of 8.5 TR AC
is all the servo motors having brake?please specify which servo motors having brake for stop on position and which are not.
What happen in ups if phase reverse?
What is state space method ? Why its used ? Can it applicable on linear, non-linear, 1st order, higher order, homogeneous, non-homogeneous, open-loop , closed loops , stable & unstable systems ?
how much maximum load a 2 core (Single phase) 16mm aluminium wire can take ?
I want to ask that is there any relation between current denesity of copper and material purity. also is ther any standard which defines the standard current denesity of material.
what is meant by tranformer impedance?
How to calculate per unit impedance of transformer?
In a single how much maximum current and watts using
IN SINGLE PH TRANSFORMER IF LEKAGE IMPEDANCE DROP IS NEGLECTED ,THE FLUX IN THE MAGNETIC CORE and the lekage flux linking a winding are a)proportional to the applied v to the winding i respectively.
what is the criteria for selection of conductor used for ehv ac electrical dischrge
Can anyone tell me some hints about what type of questions are asked by the interviewer by an Electronics engineer when company is installing an IPP and wants a team of engineers?