Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Why we Specify Transformer rating 433 V Instead of 415V
?

Answer Posted / dheeraj

It is a standard

Is This Answer Correct ?    3 Yes 16 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

I have been using an 600VA with 0.6 p.f UPS with my desktop which has 450W power supply unit. Can anyone explain how can this happen . Because the output of the UPS is 360W (600*0.6) (<450W)

2130


What do you mean by a phase angel of instrument transformer?

1102


whether fibre optic cable in high voltage earth conductor is used for protection circuits

1610


why do we put a transformer on soak before loading it

1138


What is electrical grounding?

1159


what is the prinsiple of dc motor and construction and working ,application of dc motor.

1955


3Cx240 & 3Cx300 sqmm Al. cable from lv side. What is the calculation for this cable??

1394


Why space heater is required for each verical bus bar chamber? if one space heater is adequate or not for anti condensation?

2524


What is evaporator & condencer & compressor

2157


When are the directional relays used?

1049


According to IEC60034-14, When the vibration monitoring system required for motor Bearing. above which KW, it is required? and for what type of bearing the vibration probe is provided.

4166


how we do Vector group ,magnetic balance and tap changer test in Transformer?

2464


We have received supplies of the ordered material. payments against the supplies also released. Where ST paid 4% against form C. Meanwhile it has been observed that 25% of material supplied was defective. Please suggest whether the issuance of C form from our side would be stopped till settlement of liabilities.

1949


what is deffrence between squirral cage and wound rotor in IM?

1963


if any body have question paper of railway (section engineering),then plz send me .i will thank of him/her.

1988