Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

who's take first position in process in the timing of new
installation flow transmitter and control vavle. give the
answer with logical trick.

Answer Posted / rahul nayak

obviously the control valve should be installed first.
because we must restrict the flow first by placing valve in
line. then only we should think about to control the flow by
flow transmitter.

Is This Answer Correct ?    8 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How RAL(Rotary air lock)works in cement industry?

2549


why orfice is not used for main steam flow calculation

2183


flow transmitter formula?

2861


Why the ammonia and Nitric Acid level indicators is with millimeter ? and What is the conversion form millimeters that level indicator indicate to weight ?

1916


What is the procedure of calibration of Load cell?

1962


Draw symbols of the following :

2030


Difference between dcs and plc including date processing and architecture.

1202


you are on site,the plant trips,you are approached by operations,what do you do?

2291


Specify ideal accuracy of flow element like orifice plate, Ventury, Annubar. Ultrasonic flow meter etc.

1971


please tell no. & add. of consultancy who recruit me in power plant as instrumen engg. present i m working in power plant as ass.t instrument engg. thanku mahesh 09226562826

2132


Explain types of valves?

1101


Why all the drains(Gland sealing,ESV,Casing inlet etc) are directly connected to the flash tank instead of hotwell of the condensor in the power plant? My Email Id:naba02222@gmail.com

2338


model question paper of instrumentation for Jindal GET 2010.plz reply sudhanshukumar08@yahoo.com

2396


steps for installing orifice plate?

1893


What is furnace draft control?

1131