For Synchronisation of DG Sets Sometimes we people use NIC
(Neutral Isolation Contactor) Instead of 4-pole ACB or any
switchgerar..Please guide me why is it so????
Answer Posted / vinod
when a DG set is started and as dg voltage is building up it is necessary to connect the lowest potential point of generator first with the system which it is to be feed, that is the neutral as first. then the breaker can be closed if the set is required to be parallel first. the reason is the system which the DG is intended to supply may have a neutral potential which can be at a different potential other than the DG. so in order to establish a common neutral NIC is used. if NIC is not there and DG neutral is always solidly connected to the BUS then grounding impedance of the whole system is reduced and in turn fault in system can lead to a higher fault current.
| Is This Answer Correct ? | 9 Yes | 1 No |
Post New Answer View All Answers
How to calculate Temp from Resister from PT100 equation,
How to test IR testing & magnetic balance test
whats the differece between Exd and Exe
what is Fan Control Cubicle
Will any motor burn if voltage provided is lesser than the rated voltage???? If yes, then how is speed control possible with voltage control
sir pls send the je exam - 2008 and other model question papers..
Electrical 'C' license full abbreviation , and full form
explain the mode of metal iranafer in Co,welding
why surge protectetor work explain with the help of circut diagram?
what is the differance between HT motors And LT MOTORS.
What is load boxes ?
How to perform a DC resistance test In Alternator and their proceduces?
what is the best transformer oil breakdown voltage?
What are the commonly used schemes for the bus zone protection?
all the technical question with answers pleas send your email id ramar_eee@yahoo.com