how to calculate rate analysis of M25 grade concrete
Answer Posted / k v arjuna rao
As per material availability the ratio's of Sand Aggregate
and Cement including admixers calcuted per cum by design
mix.
The quantites of these material is multiplied with existing
rates including Transportation charges we get the Material
cost per Cum.
Then Labour required per cum is calcuted as per CPWD
Standards and multiplied with local labour rates given by
State Govt SSR or CPWD SSR for that area. we get labour
Rate for 1 Cum.
Finally add hire charges of machinery used for mixing and
pumping and placing of concrte, Sunderies, water charges &
Overheads & Profit for contractor on Material rate & labour
rate.
finally we get Rate per Cum.
Is This Answer Correct ? | 20 Yes | 8 No |
Post New Answer View All Answers
what is idealized curve for concrere and steel
what is the basic difference between Coloumn & Shear Wall
satart to end steps by step process of building construction...? i want to planning theme accuretly
What is the origin of name railway sleepers?
how many numbers of 4inch bricks and get consumed in 9 inch BB masonary wall in cubic feet.plz send my below e.mail adress
Civil engineering related
how to convert cement, sand aggregate quantity from M3 to kg with full description?
What is the use of extruded feature in solidsworks?
How high should the water tank be to provide a 60 psi at base of this water tower?
how many running meters in one kilogram of 4mm pvc coated chainlink fencing
Which architectural movement is also known as jazz moderna?
Explain what is alternate bid?
Elaborate advantages & disadvantages of using crusher dust instead of sand in rcc work.
what is the 0 value in quantity surveying
Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.