I am having a DG set.The 415 V from Generator is step up to
460 v and then the same is used for Induction furnace.
before Step up, I am connecting LT load to my factory use.
When Induction furnace is in service from DG, when i try to
start a motor, the generator is tripped.Please tell me the
reason.

Answer Posted / wareagle

Because the motor starting current and the other loaad is
more that the breaker can handle. You did not list the
motor size of the breaker size.

Is This Answer Correct ?    3 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

why don't we use the generator as a motor? and what will happen?

1420


why does the magnetic balance tests at transformer?

1438


l&t switch FN 63 handle position can we change

2119


testing of Vector Group – YNaoD II

2469


WE HAVE THE DC RECTIFIER 1500A, INPUT VOLTAGE IS 3 PHASE. HOW TO CALICULATE THE LOAD? 3 PHASE SIDE EITHER dC SIDE. PLEASE SUGGEST ME

1423






Please explain, how to test vector group of tranformer(Delta y1) . Thank

1237


Is it required to use Automatic transfer Switch in L&T panel board if we use AMF panel with DG set? How the single line diagram will be? Please forward the material to sreenu_207@yahoo.co.in

4263


what is the role and fuction of automatic transfer switch in rotary ups

1452


iam using DM 3251 voltmeter(1 percent accuracy)for 11KV system PT ratio is 11KV/110V.can anybody explain what is the max and min voltage deviation.

1774


How much load can be taken for chiller from 1500 kva transformer

872


How to operate a ac chilar plant?

1971


Why do we need a separate control desk & PLC control panel in Boiler plant or coal handling plant? Can we provide cost effective Control desk cum PLC panel. Is there is an specific need for control desk.. kindly advice.

1882


How to arrange a hous hold earthing system to keep minimum earth resistance( below 7ohms).

1504


What are the different types of hydro schemes?

682


what is the safe meggar values for motor, transformer HT, LT and Cables? IF we want to replace I/C bay at our 220 kv substation which is of 140 mw load capacity bay to be replaced by 400 mw capacity bay.other than CT(1200/1) what are the other equipment i have to replace. why we generally use 3.5 core cable or in other word 1/2 core for neutral and also confirm me that in balance conditiob(3 phase)current in neutral will zero

1821