Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is meant by 'zero value' in quantity surveying.

Answer Posted / bhanu prakash

Zero Value in Quantity Surveying is value where we are
starting the work of Surveying. i.e . the initial position
or starting point of Survey.

Is This Answer Correct ?    23 Yes 9 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)

3765


what is the calculation of raw material for 0.35cum of m-15

1492


Why should appointment store person for project ? what is the benefits for company ?

1183


What is the quantity of cement in mix m20 concrete?

1231


What is the largest concrete dam in the world?

1238


Define What is passive earth pressure ?

1282


What is specific gravity???

1494


What is the crank length in the slab?

1126


if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.

2195


Why are pull-out tests performed for soil nails?

1232


what is the minimum reinforcement provided in beams,footings,slabs? what is the minimum soil bearing capacity to design a multistorey building

2497


satart to end steps by step process of building construction...? i want to planning theme accuretly

2019


five benefits of using standard terminology in the measurement process

3500


Critical Path Method is...

2166


For Wet Mix Mecadam design what is Optimum moisture content

2109