What is meant by 'zero value' in quantity surveying.
Answer Posted / bhanu prakash
Zero Value in Quantity Surveying is value where we are
starting the work of Surveying. i.e . the initial position
or starting point of Survey.
| Is This Answer Correct ? | 23 Yes | 9 No |
Post New Answer View All Answers
Curvature ki quantity kaise nikalte hai pls give me ans... curvature canal ka hai
GIVE US DETAIL OF YOUR PRESENT EMPLOYMENT STATUS?
What is the primary difference between adsorption and absorption?
How can you distinguish between sorption, absorption and adsorption?
Critical Path Method is...
What do you mean by the word 'shear'?
What is the difference between a wood shake and wood shingles?
How much cement,sand,bricks and water needed for 1square metre brick work?
What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.
You have 3 snd sample of different FM=0.21,FM=0.95,FM=2.90 which one is suitable for a)plastering on R.C.C b)plastering on masonary wall c)concreting column d)concreting of bored pile.also justify your answer.
percentage of metal,clay or soil & water in water bond macadam roads to know the quantities for each in total volume of 11500 cubic meters
I'm preparing to to build a simple house, but i don't know how to calculate how much cement, gravel and sand and hollow blocks i need to prepare. How many pcs of 4" or 6" hollow blocks I need for my planned 3mx6m house? thanks.
what is that one cub metre plaster in cemant and fine sand
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
How to find permissible diagonal tensile stress in reinforced brick work