how many no of cement bags required for 1:4 plastering for
100 sqft?
how many no of cement bags required for 1:3 plastering for
ceiling for 100 sqft?
Answer Posted / pramod rajput
1:4 12mm thk 1beg/10 m2 and 1:3 12mm thk 1.35begs/10 m2 1 sqmtr=10.76 sqft
| Is This Answer Correct ? | 21 Yes | 10 No |
Post New Answer View All Answers
How much quantity water should be placed in one cubic meter area?
Explain the term 'Gross unit rate' and identify the items that may be included in the gross unit rate.
In the design of bridge arguments what considerations should be made to select the orientation of the wing walls?
What is the quantity of cement in mix m20 concrete?
a solid steel rod length 2m dia and 20mm vertically hangs from celling and has a collar firmly atteched to it. above the collar an annular rubber washer of 40mm th. having stifness k = 5n/mm is placed. determine maximum stress in the rod caused by mass of 5 kg falling through a height of 1.2m.
Please design 12.5m long dubbly beam
what is right & short method of measurement of slab&beam
How to make a c++ program that converts any base to base 10?
How much quantity of rod binding work by a rod binder per day
03. a. The water cement ratio for achieving maximum strength of concrete is…… 1 b. Water/ cement is inversely proportional to-------------- 1 c. Increasing the slump decreases the strength: True / false 1
Whats the standard thickness of 20'/30' wide rcc service road and what will be the estimated cost per cubit feet
I have a slab of 20cm thickness of 20m by 4m in wich we are installing 15 tons electric panels , and we have put 4 H-shaped columns under the slab but we have done many cores in the slab which seems very normal , can you help me by telling me how to calculate the bearing capacity of the slab or give me an idea if i should increase more columns Note: load distribution area 12*1.5 m2
Explain what is change order request?
Draw a neat sketch showing the 'throat' of a welding in a plate girder ?
B.M DIAGRAMS & S.F DIAGRAMS OF CONTINOUS BEAMS