Answer Posted / aftab ahmed mazari
Following procedure should be done for control valve
calibration.
Suppose it is spring loaded and direct action.(Direct
action means at top of diapgargm signal and with the
increase of signal, stem will move downwards or the stem
will extend).Also valve is signal to close. Check its Bench
Set. Suppose it is 6 to 21 PSI.
1. Set pressure regulator of positioner at about 30 PSI.
2. Apply 3 PSI (4 mA if positioner is smart or electronics)
signal to Positioner.Gradullay increase signal. Note the
movement of stem.
3. Apply 6 (8 mA),9 PSI (12 mA), 12 PSI (16 mA) and 15 PSI
(20 mA) signal. Valve stem should move accordingly and
indicator must show 25%,50%,75% and 100%.
4. If error, remove it from zero and span of positioner.
5. If facing any error problem, give signal 50% and then
remove error. Rest will be ok automatically.
6. Suppose valve is normally closed and at any vent service
and signal to close as I mentioned earlier, then make shut
close of valve at 14.5, or 14.7 PSI. Valve may start
closing at 2.75PSI.
7. If valve is at control operation, like level, pressure
etc, then calibrate it accurately.No need to calibrate it
at 2.75 and 14.5 PSI.
aftabmazari@yahoo.com
| Is This Answer Correct ? | 31 Yes | 3 No |
Post New Answer View All Answers
Yokogawa CENTUMVP R6.09 unable to download to Engineering Station with ExaOPC R3.75
The issue is when I try to download the common project section to the Engineering Station (STN) from the HIS in System View, it is unable to connect. The error displayed is:
WARNING: Could not connect to equalize destination. (7001)
Retrying. Number of retries = 0/1
ERROR: LdXopsLoadMain: connect error 10060
ERROR: Processing terminated due to connection error. (7002)
Equalization end with errors. STN0149
---- ERROR = 2 WARNING = 1 ----
Background:
>Updated the ExaOPC software on the STN from 3.60 to 3.75
>STN operating system is Windows Server 2008 R2
>HIS operating system is Windows Server 2016 Stanard
Solutions attempted include:
>Ensuring all IP addresses are correct and all networked devices can be pinged.
>The ability to ping a device using its host name from another device (
Explain PID, ON/OFF, Controls
How to Calibrate Level Switch in field
what is gas metering system? gas chromatograph? and gas compressors?
what is the difference between Cv and air consumption? why the customer needs Air consumption details?
pls give me presant awerness quistion and answer in my emailid.
How to Calibrate Coriolis Flow transmitter in field
What are the key features of a Distributed Control System? describing the various layers (sensor through to business system interfaces) as well as the hardware, software and security aspects of the DCS.
field bus transmitter calibration procedure tell me
how to calibrate load cell
Difference between dcs and plc including date processing and architecture.
what is loop1 and loop2 in MTS LT?
What is instrumentation control?
How many interlocks at turbine? Plz explain briefly
IN CONTROL VALVE SPECIFICATIONS GENERALLY TERM " DE- 200" ."DM -400"USED,, WHAT IS DE/ DM STANDS FOR?