2.5mva transformer is installed in our company with oltc
but it is not working in auto mode ,it is operative in
manual mode control wiring is done how can i rectify it?
Answer Posted / s. venkateswararao
check the selector switch auto mode comand, and auto tap
changer time setting lower and upper voltage level setings
to be checked.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
how do u gauge the size of the cable ?for eg. consider a 300 sqmm L.T Cable.How do u determine the size of the cable seeing it pratically?
how to decide the panel size like MDB ,SMDB PANEL SIZES
What are the advantages of hydropower?
I want formula to calculate cable size as per load given in length & amp. I searched many sites but didn't right answer. Please reply me asap.
How much pf maintan in dg set in 6o% load,when Dg runnig Neutaal Earthing removed what happen.
what will be d.g. capacity to cater together for 14hp A.C. load & 3kw lighting load
Which type of a.c motor is used in the fan (ceiling fan, exhaust fan, pedestal fan, bracket fan etc) which are find in the houses ?
Pls tell me whether we can use EN3A material for shafts of Permanent magnet alternator.What will be the effect of magnetic and nonmagnetic material for shafts on magnetic properties of PM rotor .
Why we find the sensitivity for the CT's to check?
L.A. (Lightening Arrester) is located at a place from where transmission line enters the transmitting substation. So L.A. (Lightening Arrester) is the first equipments which has to encounter with lightening, high voltage surges and switching surges. It has to absorb energy of lightening, high voltage surges, and switching surges. L.A. (Lightening Arrester) is made up of layers of semiconductors. If these layers can not tolerate energy released by lightening, high voltage surges, and switching surges the L.A. (Lightening Arrester) blasts.
What are the advantages and disadvantages of negative feed back?
I want d.g.set our company
how to measure earth resistance of a substation
Do you need any help with FEWA Electrical Supervisor exams?
how can calculate resistance box for 15 kw, 6 pole, RV-230, RA-42 motor