Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

i install a DP transmitter of Faugi on drum level of boiler
but i face a problem in it when i engergize the transmitter
the meter shows 0 or 100% no variation in it.the distance
of two points is 19.5 inches, i am in trouble please
suggest me what can i do it's very urgent Please reply me
as soon as possible

Best regards

ikraam haider

Answer Posted / r.murugan

Dear haider
your transmitter calibration is perfect before charging the tramsmitter you have to fill the water in the condensing pot at low side of the tranmitter

boiler is shutdown condition please confirm DRUM VENT ISOLATION VALVES ARE OPEN

IF DRUM VENT ISOLATION VALVES ARE CLOSE YOU WILL NOT GET CORRECT READING

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Isometric drawings are generated during _________________ phase of a project

2124


Gas equation

1895


Explain about safety integrated level protection? . How it was differ from other protections ?

1816


in valve is constructed as per SME B 16.34, then which standard is used for fire testing of valve?.

2063


How can i copy program (parameter) from mm440 (V.F.D.) by using BOP?

2776


Describe the functions of the Operator Interface including the considerations related to alarming and display layout/configuration/layers.

2134


hi sir yhis is zahid ali i am preparing for the jspl at oct.4.please send me the recently updated sample paper.

2226


What is standard procedure of manual mapping in Radar type level transmitter?

1990


what is vibration a part of proceess variable? if vibration is a part variables then how we minimize the actual vibration on machine on load,? vision of instrumentation contrl plz ans me IPGDL interview question

1986


the 3 most common transmitter protocol being in refinery or qatar gas and aramco.

2987


what are the definitions of input, output, command & signal according to instruments controlled by PLC using DCS System?

2168


Explain bernoulli’s theorem. State its application.

1229


How to change dcs card in online. (Dsc is maxdna)

2821


Why all the drains(Gland sealing,ESV,Casing inlet etc) are directly connected to the flash tank instead of hotwell of the condensor in the power plant? My Email Id:naba02222@gmail.com

2340


What is the use of single seated valve?

1123