Answer Posted / veeresh
When re-compiling a job, the optimizer will not compile code it detects was not changed. A Force Compile re-compiles all the code in the job.
| Is This Answer Correct ? | 6 Yes | 1 No |
Post New Answer View All Answers
What are the different kinds of views available in a datastage director?
What are the various kinds of the hash file?
If you want to use a same piece of code in different jobs, how will you achieve this?
What is the difference between hashfile and sequential file?
Have you have ever worked in unix environment and why it is useful in datastage?
What are sequencers?
how can we validate the flat files using the date in the header and number of records in the flat file? Using both conditions at a time.
What are constraints and derivations?
how to write server Routine coding?
What are datastage sequences?
What are the steps needed to create a simple basic datastage job?
How to convert RGB Value to Hexadecimal values in datastage?
how to implement scd2 in datastage 7.5 with lookup stage
1)How will u implement SCD2 by using surrogate key. 2)What are the disadvantages with surrogate key. 3)How will you handle nulls in your project for the varchar, integer data types. 4)Can I use two fact tables in star schema. 5)3 jobs are running on the 2 nodes after I added one more node so can I compile those jobs to run on three nodes.
Describe stream connector?