how to calculate concrete qty for footing using M25 grade
1:1:2 for 731 cft.
Answer Posted / pervaiz
we have total 731 cu.ft
Now calculating
Cement
1/4x1.54x731 = 281.43/1.25 = 225.14 bags
Sand
1/4x1.54x731 = 281.43 cuft
Crush
2/4x1.54x731=562.87 cu.ft
Now verifying
| Is This Answer Correct ? | 5 Yes | 10 No |
Post New Answer View All Answers
can u plz send me ntpc placement papers(civil engineering) at mohit_verma21@yahoo.com
what is civil enginnering & what you need of this course?
Actually i am confused that how to calculate the bending moment for a semi-circular beam and curved slab.If any one have a good idea about the matter,please give the answer with a suitable example. Thank you......
why do we not deduct volume of steel to find actual volume of concrete in practical???
what is the meaning of 40/20 src
How much does the leaning tower of pisa lean?
why do we provide haunches in rcc box or underpasses?
While calculating the weight of the steel per running meter, the formula used is [(dxd)/162]. Why 162 is used in denominator & how it is derived?
How does a traffic light signal work ?
how many BSCs can i connect to the HUAWEI MSC
Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?
How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?
what is the water cement ratio? how to calculate it? list the wt. of constructions materials including concrete both ordinary and light wt. concrete
What is meaning of FREE STANDING STAIRCASE ?
Explain what is Critical Path Method (C.P.M)?