how to calculate concrete qty for footing using M25 grade
1:1:2 for 731 cft.

Answer Posted / pervaiz

we have total 731 cu.ft
Now calculating
Cement
1/4x1.54x731 = 281.43/1.25 = 225.14 bags
Sand
1/4x1.54x731 = 281.43 cuft
Crush
2/4x1.54x731=562.87 cu.ft
Now verifying

Is This Answer Correct ?    5 Yes 10 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Coverage of 25mm.thick ratio of 1:4 cement mortar?

1410


five benefits of using standard terminology in the measurement process

2868


What things you need to take care of before building a kitchen island?

737


please briefly explain calculating or estimating steel quantity for a RCC column?

1448


What Reinforcements Are Used In The Process Of Prestressing?

845






Water filter calculation formula

1341


2. In a container filled with each of the following materials, at a porosity of 40%, determine the upward gradient required to cause the quick condition (a) Lead shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c) Sand with a G = 2.32

1902


What is the primary difference between adsorption and absorption?

735


pls give me ans to ACT formula cube testing porpuse

2548


How to calculate the load of partion in flat slab if we use brick?

1396


step by step procedure to find out the percentage of steel in coloum,beam,slab,footing in detailed

1920


how do you stabilize a waterlogged area in road construction

6316


how to do sudoko puzaals?

1838


how to diffenentiate the fixed beam and simply supported beam in the execution while reading the drawing and how the reinforcement detail will be differ for the above.

1975


material required for construction of 1cu.mtr wall (Cement, No of bricks (Brick size 40cm x 20cm x 10cm),sand,Quantity of water

3256