Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is the role and reponsibilities of Electrical
Engineers in construction field?

Answer Posted / hidayath

1)The main roll of Electrical Engineer in Construction
field is fully about safety,power consuming ideas and
limiting the wastage of power supply.
2)Creativity in designing new circuits which is capable of
the building design.
3)Reducing the Power consumption day by day.

Is This Answer Correct ?    12 Yes 8 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How colour picturetube works & how many year it will works.

2035


1.What will be stored in online ups EPROM IC?

2053


What is the difference between Droop vs Isoch Control?

2438


PLZ sent the previous year question paper for GET in NHPC on my EMail id ppshanker@gmail.com

5449


why in a swquence network representation, the negetive sequence generated voltage is taken as zero?

2015


what is the write prosidure of stringing of 8meter pcc pole.

2454


what is the affect of earth's magnetic field on the frequency used in aircraft???

2010


Can Anyone Answer anyone of these ? Q1) why direct SOLUTION of Load Flow Studies in Not Possile ? Q2)Why majority of Buses in power system are load buses Q3)Why one of the buses in Power system is taken as reference bus (slack or swing) Bus ? Q4)Bus Admittance Matrix is a sparce (means it contains some zero elements ) matrix , give reason

1916


how do prepare ongc exam.how is it question model.i am electrical. which part covering in electrical.tell me

2266


i have total 8 dg sets for synchronizing and 2 buscoupler,1 sectoin dg no 1,2,3,and 2 sectoin dg no 4,5,6,and last section dg no 7,8 ....if buscupler no 1 and 2 is off mode ..than dg no 1,2,3,will synchroniz of another dg sets?

1816


why would amp draw on neutral wire be as much as amp draw on the hot leg.

2093


Is it posible to instal one more SMDB from the existing SMDB and is it practical.

2097


What kind of Neutral CT can be placed in 11/0.433KV transformer to be used and what are its specification?

1904


How to synchronization will be done between two DGs ?

1773


why Y CONNECTION IS BETTER INTERMS OF EFFICIENCY AND P.F FOR A LAOD LESS THAN 40% AND WHY AFTER DELTA IS BETTER FOR > 40%

1950