Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is the role and reponsibilities of Electrical
Engineers in construction field?

Answer Posted / hidayath

1)The main roll of Electrical Engineer in Construction
field is fully about safety,power consuming ideas and
limiting the wastage of power supply.
2)Creativity in designing new circuits which is capable of
the building design.
3)Reducing the Power consumption day by day.

Is This Answer Correct ?    12 Yes 8 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is protection class current transformer.

4397


which is the best institute for PLC,SCADA,DCS in hyderabad

2421


Briefing the effects of ASR and ACR of a double closed-loop speed regulating system.

2285


primery try cell?

2260


what are the different methods for the starting of a synchronous motor.

1172


DESCRIBEPNEUMATIC SYSTM OF ASH HANDLING PLANT

5598


What is gross error?

1197


Do closed loop systems require manual input?

1222


PLEASE SEND ME NTPC RELATED INFORMATION LIKE WHICH TOPICS HAV MORE SCOPE,BOOKS TO READ,CUT OFF...PLEASE.mail at thiru.1203@gmail.com

2155


i completed my DEEE. and i want to electrical c license. how to get it..?

2225


i have seen one 8.4 MW synchronous motor in a plant located in bellary it is fixed with brushless rotary rectifier ,anybody can explain its start up principle

2030


Sir, My doubt on cable sizing calculation, Load:74 KW calculated cable 1 run 50mm2. Now client asking us to reduce cable size by increasing runs. Sir, My question now when my mind strikes with 2 options 1) Divide load 74/2 = 36 and calculate cable for 36+36 making it 2 runs or 2) Simply i can divide 50mm2 /2 ie. 2 runs of 25mm2 Please suggest me sir

2016


1. If 8.35%Z means the percentage impedance of 132kV-line from power company, we will like to confirm its base capacity?

2020


please send me jindal previous aptitude and technical question and answer.my email id is deep_raj@live.com

2026


what is the chiller and working principal

2383