How to calculate the cement, sand quantity for plastering?
(10'x10')10mm thick ratio 1:5. wht"s the formula?
Answer Posted / sunandan sharma
10feet = 10/3.28=3.048m
volume = 3.048x3.048x.01=.093 cubic meter
for dry material factor is 1.2
so quantity of dry material=0.093x1.2= 0.11cum
now the ratio is (1:5)
so cement=0.11/6 =0.018cum=0.64(.018x28.8bags)
=0.518bags=25.92kg
sand=0.018x5=0.09cum=3.17cuft
| Is This Answer Correct ? | 4 Yes | 2 No |
Post New Answer View All Answers
How to plan a project
What is braced excavation all about?
Define graphics window?
I need old MMUP exam question and answer for Civil engineering
what will be price of 1:2:4pcc per kg?
what is the name of shuttering oil used in oman
What is meant by Crystal Concrete?
detailed calculation of the amount of cement used?
Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?
what is features of a typ-ical modern air-conditioning installation?
Would you cause a 55-gallon drum of water to weigh more by climbing in?
How to calculate concrete in percentage wise ,for example cement 18% sand 40% aggregate 40% and Stell 2% ,I need and??
how clculate excavated or backfilling quantity by simpson's rule
what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?
What is the significance of cost estimate knowledge for an architect?