Answer Posted / mathi.v
portland prozzolon cement & Dont add FLYASH on this cement
| Is This Answer Correct ? | 3 Yes | 10 No |
Post New Answer View All Answers
what is Short bored pile foundation.
How to plan a project
Explain how you can turn off the display for dimension in CAD?
how ratio is calculated for any grade of concrete. for e.g. sppose M20 requires(x;y:z) quantity of cememt sand and aggregate.
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
if dia of inner circle is 42 m and depth is 1.5 m and width is 1 m ,then whait is the quantity of steel?
why demand factor less then 1 ?
Can we use the flyash bricks in brick bat coba?
how to calculate load bearing column
what are the values of compressieve strenght?
2. In a container filled with each of the following materials, at a porosity of 40%, determine the upward gradient required to cause the quick condition (a) Lead shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c) Sand with a G = 2.32
what is the percentage of silt in black cotton soil.?
for 200 kg of cement how is the mix proportion in kg for m25 grade of concrete