Answer Posted / prashanth
Reusing of the resoureces and as well as natural resource
like wind,solar,lighting,rain water harvesting.
Resuse of hazard waste.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible.
The foundations are placed below ground level, to increase?
where will be the reinforcement of slab placed when there is an inverted beam and the bottom of the beam and slab are at same level ?
what might be the problem faced in the near future if the M-sand is used in the place of river sand during wall plastering? (As per IS)
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
Rate analysis of Vitrified tile in cement mortor 1:3
What is Architect-Prepared Contract?
how to calculate reinforcment in staircase cranked beam?
How long does it take concrete to harden?
i need gate exam civil engineering question papers with answers
HOW MUCH STEEL REQUIRED FOR SLAB OF AREA 23'3"*18.3"? FOR SLAB HOW MUCH DIAMETER BAR WILL USE?
Hollow block masonry in cement mortar 1:4, 40×20×20cms in superstructure take 10sqm.I want calculation of brick sand
in plate load test what is the thickness of plate 20mm 5mm 50mm none
I Want To Know Quantity of Cement Conc. & Sand in Column of 9"x9"x10'
What is the veriplus for ellips card length formula (major axis 3.4m,minar axis 2.6m spacing 0.2m