Bus-bar is made of which material & name of mostly used
material in bas-bar design ?
Answer Posted / sennapparajan
copper is the dedicated material for busbars. for reducing
cost people using aluminium also.aluminium having low KA
rating capacity.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
What type of core material is used for metering C.T and protection C.T???
Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.
I Just want do EHS Certified Certification Distance Course From Govt approved,so can any body provide me details.
can anybody sent me power grid questions. what subject should i prefer for preparation?
what is the circulate the diesel in DG in side pls tell parts name and picture with circulate the diesel
Give the topology of current amplifier with current shunt feedback?
what do you mean by every IC 74 first digit.why are you using this no.why not using another no.
how desiel generate sart fail of eb?
hey guys help me out.....what are the industrial uses/functions of nozzles in industries
what is the difference between linear choke and suction choke?
what is the correct method for the outdoor termination of 19/33 KV HT cable step by step?
sir my exam is on 19/6/2013 under electrical branch pls send me sample aptitude questions as well as sample technical questions for jindal steel and power company
Draw a 230kv two-bus bar system showing the following. 1.Two generators (150MW) each connected through one 15.75/230KV transformers 2. 1 outgoing lines 3. Two 230/130 KV transformers 4. BUS PT's 5. CT
Load break swicth maintenance procedure.
1.why should we connect the measuring instruments in l.v side in short circuit test of a transformer? 2.why the power factor is less in open circuit test of a transformer?