what is the sla in your current project? what is the
billing rate? how to answer these questions? i explained
about the ticketing levels p1,p2,p3,p4 but the interviewer
was not satisfied with the answer what does he mean by sla
in the project??
Answer Posted / nbpatil1
Definitions
Incident:
Any event which is not part of the standard operation of a
service and which causes, or may cause, an interruption to,
or a reduction in, the quality of that service.
Ex: Batch Job failures, Users reporting performance issue
Service Request:
A service request is a request for a specific service that
is not due to disruption (i.e. failures in application)
Ex: Request for User id creation, Request for ad-hoc report
Problem:
A proactive ticket initiated in order to find problems
either before they occur or to reduce the overall number of
incidents by proactive measures or provide a permanent fix
to major incidents/outages.
Work-
around:
Method of avoiding an Incident or Problem, either by a
temporary fix or by a technique that means the Customer is
not reliant on a particular aspect of the service that is
known to have a Problem.
Guidelines for Severity
Severity 1(Critical): A critical business process is
hampered. There is
an immediate loss of sales, production, or other comparable
business on a large scale. The affected users have no
readily available alternative way of performing normal work.
Severity 2(High): A critical business process is impaired.
There is an immediate loss of sales, production, or other
comparable business on a medium scale or losses are largely
recoverable. The affected users have no readily available
alternative ways of performing normal work.
Severity 3 (Medium):A non-critical business process is
hampered. There is an immediate loss of sales, production, or
other comparable business on a small scale. The affected users
have readily available alternative ways of performing normal
work.
Severity 4(Low):A non-critical business process is impaired.
There is no immediate loss of sales, production, or other
comparable business. The affected users have readily
available alternative ways of performing normal work.
Bug fix Vs. New functionality(Change Request-CR)
If the business wants a change to current functionality
(i.e. Item Category Mapping), this is definitely a Change
Request. It is not something that worked one way yesterday
and now works a different way today (i.e. Bug Fix Change
Request), but rather something that the business wants to
work differently than it currently does (i.e. Change
Request). Remember something that does not function as
desired, is not a support activity. Only those things that
do not function as designed. Therefore, this is not
something that the support team should be chasing.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
Where do you assign text determination procedures for customer master records and for documents?
Explain the various sections of ‘customer master record’.
how to attach pdf in output determination .
What do you control at item category level in the delivery?
Can you configure two diff free goods items for one single item?
Once you create a sales order, how do you confirm to the customer like I have the stock for ATP to check for the customer?
How can you go for billing?
During route determination the system also needs to know the departure zone of the goods to be shipped. How does this information come into the sales order?
When would you use a sap return order and sap credit memo?
A Client wants to connect his SAP ECC system to his SAP CRM system. What do you want to do to enable the integration. a)Install the plug-in on the CRM system and connect to the R/3 adapter in the ECC system b)Install the XIF adapter on the CRM system and connect to the R/3 adapter in the ECC system c) Install the XIF adapter in the ECC system and connect to the R/3 adapter in the CRM system D)Install the plug-in on the ECC system and connect to the R/3 adapter in the CRM system
In vfo3 invoice date is showing before billing date invoice date is showing sep 25 but billing date is showing sep18th In wht case the Invoice date is before Billing date
Tell me a customization which you have done & worked for your client which is not in standard SAP settings? Explain the requirement along with detailed procedure & process,t- codes if any from your real time data in your project? This question is most frequently asked in many interviews.Please reply asap... Urgent!!!! Waiting for your response eagerly... Thanks in advance
Default distribution channel we have only one distribution channel in our company. Can we default it in the transaction field that needs distribution channel data? How can we configure that?
How many cons. Does u have in your project?
What is the difference between transaction data and master data?