Answer Posted / munesh natrrajan
When the Length of Bars available in the market is many
times smaller than the length required or when pieces of
bars are to be utilized,the bars are required to be lapped
that lapped length is called lap length.
Lap length will be as follows;
Tension - Ld or 30 x diameter of bar,whichever is greater.
Compression - Ld or 24 x diameter of bar,whichever is
greater.
| Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
What is the quantity of cement used for stone pitching work of 100sqm 225mm thick and cement mortar of 1:6? And how?
what motivates you to do a good job
Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting
Trapezoidal section footing calculation of Volume & its Area
Permissible wastage of cement as per IS code ? In which IS code I get it?
Reinforcement details at hinged joint
How you can turn off the display for dimension in CAD?
To pcc 11 ft x 24 ft .How many bags of cement, sand and aggregate required? And for roofing how many cgi sheets required?
How many square meter can mason layout chb per hour
What is rate of concrete surface rendering work per sqm
Floor to floor high of domestic building is 3m design a quarter turn staircase starting assume taken give a suitable diagram of it?
How to calculate Volume of Wet cement concrete for a specific grade?
Define What is made from large rocks, which protects the base of cliffs?
afe or not
what is mail role & relationship between senior Civil engineer to consultants , Construction manager ,project manager, project engineer ,Technical engineer & qa/qc engineer ? what is the responsibilites of Senior Civil Engineer?