Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How to calculate transformer capacity requirement for a
project site?

Answer Posted / vathnak kong

Example
We have Power load 2300KVA
So
Transformer Capacity=2300×1.4
1.4 is Power rate

Is This Answer Correct ?    6 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Why there are some equipment(i.e:TV) that using 2-pin plug instead of three? What happen if there is current leakage? Are we going to get electric shock??

2246


What are marginally stable systems?

1142


what are the main faults that occur in stabilizers? How they corrected and resolved ? Types of stabilizers ?

2147


Do inductive loads have distorted current waveforms ?

2002


what material is the electrical housing wire made of? is there any difference for the telephone lines?

2031


If SFU is Switch Fuse Unit, What is the expansion for FSHF in Electrical Engineering?

2646


given data are load current & power factor cable core size? plz any one update the calculation formula

1936


WHAT IS START TO INDUCTION MOTER IN STAR TO DELTA OF >5HP ?

1912


plz tel me syllabus and exam date 4 jr executive engg (electrical)

2032


I had applied for JE in PSEB, Can you pls send me the Question bank for related to my field

1912


is it true there's a big difference in using Cummins or Denyo...especially power output or leakage

1985


Dear sir, iam completed iti ncvt electrician 2000-2002 & diploma electrical eng completed 2008-2010 distance education in rvd university, still i got B licences only but my working company want C licences, how to i get c licencese pls reply me iam in critical situation thank you karthick 9841637803

1742


and gate circuit diagram,amplifier circuit diagram

2118


Iin ESP why positive is grounded ? why not negative ?

2754


what is mean by PIR in circuitbreaker and give me detail of that?

3573