Answer Posted / pandu27581
ppc means planning and programming control
| Is This Answer Correct ? | 3 Yes | 68 No |
Post New Answer View All Answers
What is thumb rule in quantity and cost estimation of a residential building?
What does civil status mean?
what are RIB slabs explain about it
for 32 dia (EQR HYSD steel) bar how much deduction for 45 and 90 degree band
Requirement of cement, and steel 1:2:4 ratio concrete in 1128 Sqft area(Cement No of bags, steel in Kgs)
what is thumb rule for calculating the size of ISMB required for a particular length of span
Currently my house construction is going on but we just realized that the portico earth beam couldn't connect with the original earth because the beam rod not extended so Please advice
explain the rale of the government in the construction industry
How will drive weight formula for circular cylinder steel bar in kg/ m please step by step drive?
How much cement and sand are required for 1 square feet of plaster at a thickness of 15 mm at a ratio of 1:4?
what is the proper procedure in conducting a california bearing ratio penetration test on soil on cbr machine?
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day
Elaborate advantages & disadvantages of using crusher dust instead of sand in rcc work.
undistributed samples are obtained by