HOW TO FIND OUT THE QUANTITY OF CONCREATE
Answer Posted / suresh
QUANTITY OF CONCRETE=LENGTH OF STRUCTURE*WIDTH OF
STRUCTURE*THICKNESS OR DEPTH OF STRUCTURE
L*B*D=VOLUME
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
What is the tallest man made structure in the world?
What is the quantity of metal 1 & metal 2 to be used in 100 cft concrete?
What is the life of anaerobic Digester if it is used for municipal solid waste digetion.
Which is the direction of negative angle?
que.is ideal size of bricnk use in india,joint size of mortar in massinary ,how many bricks used in 1cum.how to test at site.what is the possition of marka used in bricks?
Define current ucs?
Slab quantity
Where will be the maximum bending moment in a TEE Beam?
For sloping slabs or sloping beams why the tension steel from either side of ridge is taken into compression zone of other side?
what is the anchorage length of reinforcement.
all technical question
What is the use of mirror command?
What do you understand by “preset” during the installation process of bridge bearings?
What is the procedure and technnology behind jointing of prestessed block in Delhi metro rail project.
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.