WHEN I AM CONNECTIN TWO ELCB IN PARALLEL.ONE ELCB
TRIPPED...HOW IT HAPPEND??
Answer Posted / karthick
pls to be check elcb current rating in case rating are
different. lower rating elcb got easily tripped. in case
elcb rating are same connecting load to be check
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
what is mean by dry frequency
Why are the cores of large transformers built up of circular transactions ?
for 11KV OH system what will be typical per KM "R" "L" "C" parameter. for 33KV OH system what will be typical per KM "R" "L" "C" parameter. for 33KV UG system what will be typical per KM "R" "L" "C" parameter.
two phases with neutral supply can be taken in 3C X 10 sq.mm cable .
How to Calculate Transformer Earthing Electrode Rod Size both Body and neutral Earthing ? Any Standard Formula? Please Suggted
Whether power factor should be high or low? Why?
HI SIR, AM PREPARING FOR RRB FOR SECTION ENGINEER POST. PLZ SEND ME THE PREVIOUS QUESTION PAPERS AND HELP ME. I HAVE NO ENOUGH TIME MY EXAM DATE IS 22ND JUNE.... MY EMAIL ID IS nalla.amarnath@gmail.com
Is it true that in the 3 phase transformer, the limbs of the core are at 45 dgrees to each other. if true, why?
can we conduct the swineburne's test on a dc series motor? why?
what is transient voltage?
This is reqd for a 1MW Solar power plant..We have 2DC outputs from the solar panels Connected to 2INVERTOR panels.. Output from invertor is 3ph,280v,500kva,50hz.These are connected to individual ACB.This has to be stepped up to 11KV ,1250KVA SYSTEM.Now can I use (1) one more ACBTO GIVE A COMBINED OUTPUT OF 1000KVA,280V & STEP UP THE OUTPUT BY USING a single two winding 3 ph transformer 11kv/1250kva. or (2)use the two outputs and connect to one three winding transformer of above rating..Pls suggestwith details.
in shunt clippers why a resistor is used in sereis with the input
if i am in front of transmission line how to know that current direction without any equipment
please send me previose rrb junior engineer qustion papers
Q) Write VBscript code along with QTPscript code in QTP tool for below scenario 1. Launch yahoo site(i know) 2. Do loogin(i know) 3.Click inbox link(i know) 4.Go to every page of mail box and count no.of read mails and no.of unread mails(i know) 5.Store page numbers, read mail count and unread mail count in a new excel file sheet 6.Create 10 types of graphs on that data 7.Do logout and close site(i know) 8.Save new excel files with graph