Answer Posted / devender singh

BBS is bar bending schedule.the ring size of 300*300 column
will be 300-2*40=220mm.for bending 75mm should be taken for
each of two ends.the total no of bends will be 5.if 8mm dia
bar is used then cutting length will be 4*220+2*75-
5*2*8=950mm

Is This Answer Correct ?    21 Yes 14 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is detail procedure of eccentric footing? plz. give solved exmple?

1838


Why Vitrified tile are getting pop up.

536


who to find building iron rod strenth

1584


how to calculate 1:5:8 ratio concrete cement, sand, metal and water please give me brief calculation

1224


Explain the mechanism of cavitations in pipes and drains?

670






What is Curtailing of R/F

1988


What is chemical composion test

1511


how many BSCs can i connect to the HUAWEI MSC

1842


100mm block work 64 bags of cement used 150mm block work 286 bags of cement used 200mm block work 20 bags of cement used patly work (M15) 293 bags of cement used mortar ratio is 1:5 how to calculate volume of sand in cum & no. of bags

2029


How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 600 microns?

6269


pls tell me about method of cutting length of ties column

2135


what are the changes in concrete pour height as per IS 456, 2009?

2713


At what point does a circle start losing area when being flattened?

638


what is the quantity of block work required to construct a compound wall of 6" thick,and 212 lenght

968


Which ratio use for cement selery???

1393