What is a BBS?Find out the cutting length for a 300*300 column with 40 mm cover?
Answer Posted / devender singh
BBS is bar bending schedule.the ring size of 300*300 column
will be 300-2*40=220mm.for bending 75mm should be taken for
each of two ends.the total no of bends will be 5.if 8mm dia
bar is used then cutting length will be 4*220+2*75-
5*2*8=950mm
Is This Answer Correct ? | 21 Yes | 14 No |
Post New Answer View All Answers
what is detail procedure of eccentric footing? plz. give solved exmple?
Why Vitrified tile are getting pop up.
who to find building iron rod strenth
how to calculate 1:5:8 ratio concrete cement, sand, metal and water please give me brief calculation
Explain the mechanism of cavitations in pipes and drains?
What is Curtailing of R/F
What is chemical composion test
how many BSCs can i connect to the HUAWEI MSC
100mm block work 64 bags of cement used 150mm block work 286 bags of cement used 200mm block work 20 bags of cement used patly work (M15) 293 bags of cement used mortar ratio is 1:5 how to calculate volume of sand in cum & no. of bags
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 600 microns?
pls tell me about method of cutting length of ties column
what are the changes in concrete pour height as per IS 456, 2009?
At what point does a circle start losing area when being flattened?
what is the quantity of block work required to construct a compound wall of 6" thick,and 212 lenght
Which ratio use for cement selery???