Hi Experts, Tell me how an Output Determination is done?
What are the different ways to determine Output? What are
the techniques involved in Output Determination? Give me the
Detailed Configuration & Customization steps along with
detailed Procedure, Path, T-codes (if any) and explanation
from your real time data for your Client/ Project? It’s
Urgent!!!!!! I have interview within 1-2 days? So, I
request you to provide solutions to above question as early
as possible? Your timely help would be greatly appreciated?
Thanks in advance Regards
Answer Posted / arvind
You can simply do all the configuration in NACE t code
Follow all the steps as in Condition technique
Later select your application V1 or V 2 or V3 and assign
your print program to the smart form or script for your
particular condition type and proceed with config
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
hi gurus, i have used variant configuration(a customer ordering a computer diff combination of monitor,cpu,keyboard) this is my scenario. i have taken and assigned(ct04,cl02,mm02) dov(10x11,11x12,12x13),colour(red,brown,grey),price(sdco,vko nd).now those were again assigned in cu01. can u provide solution urgent.
What is a partner type? Give some example?
Do you have any link for customer master and credit management?
Do you participate in implementatation? What is your role in imp. Phase? what have udone in implementation? Which methodology you use in imp.?
How can you tell if a transport entry is in the process of being imported in sap ? : transportation management
Sir, I'Ve interview with IBM . I want few SAP-SD real time tickets and its solution .Its urgent. Plz help me . thanks in Advance
what are the two places where you need to configure cin (country version india)?
What is higher level item category? How it’s controlled?
What is the difference between connected & unconnected lookup?
A Client wants to connect his SAP ECC system to his SAP CRM system. What do you want to do to enable the integration. a)Install the plug-in on the CRM system and connect to the R/3 adapter in the ECC system b)Install the XIF adapter on the CRM system and connect to the R/3 adapter in the ECC system c) Install the XIF adapter in the ECC system and connect to the R/3 adapter in the CRM system D)Install the plug-in on the ECC system and connect to the R/3 adapter in the CRM system
What is sap transport layer? : transportation management
What is the client no of SAND BOX.GOLDEN CLIENT, UNIT TESTING,ENDUSER TRAINNING AND PRODUCTION SERVER?????
one of interviewer asked me this requirement please tell me anybody? Issue: the problem faced by us right now is,when there are more than 2 route codes available, users can select a wrong route code which is a longer route for the destination, the physical shipment can still go through a shorter route, but company will end up in paying more. Requirement: user maintained route list, the user will maintain a master from which route should be picked, users should be able to enable or disable a particular route. Thanks in advance
Define the material taxes in ovk4, which will then be maintain in material master.
What is a sales deal and how to configure it?