i have dry type transformers can you help me that how many
tests i can do to know the performence of transformer and
also please tell me about the BDV test and Insulation
resistance test in oil cooled transformers

Answer Posted / nithiya

tan dalta test only for above 220KV higher rating
transformers only conducted , Impuls test only conduted in
factory only..and Asper IS 1866-2000 less then 72KV=40KV,
170KV=50KV above 170KV=60KV.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

sir please send me techinical questions for junior engineer posting in bangalore railway i am diploma holder

1557


Application Comparison between 22KV (UE)and 33KV (E) system. Are we allowed to use 33KV (E) cable in lieu of 22KV (UE) cable. What are the technical disadvantages.

2299


What are approaches to tackle sedimentation problem of reservoir?

595


what happend to DC shunt motor if its field winding insulation becomes slightly weak? will that motor can run on full load or not explain in detail. thanks

1176


what is reactive power?, why its measured in VA ? is it transient behavior of system?

1799






A 500 V shunt motor runs at its normal speed of 250rpm when the armature current is 200A. The resistance of the armature is 0.12 Ω. Calculate the speed when a resistance is inserted in the field reducing the shunt field to 80% of normal value and the armature current is 100A.

2026


does a DG set has low fault level as compared to that of a transformer.If yes then why.

1533


Describe Non I.S. Earth System and why is it used?

1300


why use phase displacement in transformer.and effect of phase displacement on transformer

2331


how to calculate mf when meter and cTPT detail are given

1365


why did youi choose this career?

1736


Mention the difference between Analogue and Digital circuit?

686


(1)Can earth and be conected together (2) what is the diferent between earth & neutral

1307


How to identify the start and end of 3phase 12 lead motor if U1, U2, etc numberings are lost or erased.

1716


HOW THE OLTC TRANSFORMER SAVE ENERGY IN COMPARISON TO OFF LINE TRANSFORMER AND IS IT ECONOMICAL TO REPLACE THE OFF LINE TRANSFORMER TO OLTC TRANSFORMER

1718