Answer Posted / suresh baria
Well point is a small sump to collect water and to put a
pump for dewatering.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Dear sir, i want to NBCC & NTPC previous exam papers email Id : madhu_bingi@yahoo.co.in
types of laps in column
20 mpa what is the quantity of cement sand and aggregate in one cubic meter of pcc non rainforcement concreate kindly answer including formaula thanks
How can we demolish concrete beams?
trapozidal
In earth work 1300 cum soil how to calculate how many liters require in water
What is Critical path in Ms-Project ?
Used Cement & Sand in 1 Square Meter or 1 Square Feet For Brick Work 0.115mm ? (1:4) (1:6)
how the calculation occurs if i want to mix 1cum of M50 concrete. please calculate every ingredients with detail calculation.
Dear Frds, How can i calculate the Steel for RCC Slab, Please provide one Example also, so that i can understand very well. Ex: Area: 1320.0 Sft.(44' X 30') Span: 15'(Default). Column Size: 9"X15"(6 No.s 12mm Rods) Please Provide Calculation Details. Thankyou. Satish
What is componsation
if i used salt as a add mixture in concrete, then what will happen and what are the naturally available add mixtures.
Scaffolding IS code NO.
What is alternate bid?
Define graphics window?