Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How can decide the MVA rating of power transformer for
substation like 220/132, 132/66, 66/33kv etc or even higher
kv rating of substation????
Send me the strictly technical answer that shows your strong
technical aptitude.

Answer Posted / srikanth.kondru

very simple

we need to know the Load of the sub station ..
for example it is 1000 H.P
as we know that 1 H.P =1.5 amps
voltage is 220 KV
power ,p = 746KW = 1.732*0.8*220KV*I
I = 746 KW/1.732*0.8*220KV
= 2.4 amps
S=220*2.4*10^6 =532 MVA

Is This Answer Correct ?    5 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

anyone knows service engineer in chennai for EDM SPARKING MACHINE.CHMER PULSE CD 60 M.pL GIVE ANY CONTACT NOS

2408


plz send me the syllabus or any sample paper for engineer trainee recruitment if any,on ravinder911@yahoo.com

2158


What is synchro?

1162


Please help me regarding my one concern. - During earth pit testing we noticed that the Clean earth pit and dirty earth pit showing continuity (Resistance value - 5ohm) . I want to know that if both earth pit have separate location and there is not internal looping between PIT then why such continuity is showing on it . Because of this issue the field side all earthing point showing short. In PLC panel we are providing two types of earthing cable which is coming from separate earth pit (Clean and Dirty earth pit) because of earth PIT showing short our PLC is not complying spec . please help regarding this issues.

1582


why high speed tripping relay is used in protection circuit why not normal relay

1474


why we need to us lenz's law for synchornous motor

2566


In general bus riser follows the bus section in SWGR. What are impacts if bus section follows bus riser?

1540


is there any role of power factor with frequency variation? and how we can manage the frequency variation?

2053


Why compensation is necessary in feedback control system?

1353


L.A. (Lightening Arrester) is located at a place from where transmission line enters the transmitting substation. So L.A. (Lightening Arrester) is the first equipments which has to encounter with lightening, high voltage surges and switching surges. It has to absorb energy of lightening, high voltage surges, and switching surges. L.A. (Lightening Arrester) is made up of layers of semiconductors. If these layers can not tolerate energy released by lightening, high voltage surges, and switching surges the L.A. (Lightening Arrester) blasts.

1097


66kv under ground cable how to layaing in ground any special case two ckt r runing

1984


what is the cause of voltage dipp or swell in the transmission lines?

2081


how to measure dc earth leakage current?

3163


3 phase induction motor connection star or delta while using ac drive motor is .75 to 5.5 kw

1957


how can we calculate the ampacity of the electrical wire/cable. and what are the factors must be considered. pls. elaborate.

2250