how can we minimize the off load losses of a distribution
transformer which is required to be energized 24x7 ??
capacity of the T/F is 1250 KVA and off load losses are
around 2.0 KW.. can we use capacitor bank at the secondary
of such a T/F to overcome off load losses? please elaborate
briefly...thanks
Answer Posted / ahmad yousuf
need answers from Transformer specialists..!!
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
various transmission tower like .,D tower ,K.C.O tower ,C.C.O tower,K.C.R tower ,C.C.R tower ,H.C.O tower in different tons.
In Dyn11 power transformer if any one of the 3 phases connected to earth in star connected side then please explain effect of the current flow in delta connected side of transformer.(In this case if one phase is shorted to ground in star connected side then we observe the current flow in two phases only not three phases in delta connected primary side. Please explain why it is so?)
Why 30kw 40 hp 4 pole 3ph induction motor over heated?any steps on reduction in heat?
how to get electrical supervisor competency certificate in gujarat. i did 3 year diploma in electrical
How to calulate Locked rotor amper(LRA) for compressor type motors?
A motor running with lenze frequiency inverter stops if I REDUCE SPEED with 25% load.If I run it in High speed and medium speed running smoothly with full load.please help me to solve it.
1) Explain why we don't link the two earthing system ht and mv on a pole mounted transformer sub-station.
With a phasor diagram show the effect of increasing the field current of a generator supplying a constant real power and connected to a grid system.
Give details of your interested designation, the post you are interested to serve the company better and explain why you think you can serve the company better in such position if employed?
What is servo motor and what are the applications of servo motor?
how to work droop ct in generating station
Mention the difference between Analogue and Digital circuit?
why only exciting current is shown not primary current in transformer???
How to Calculate The Neutral Earth flat design calculation for the Synchronised generator (Gen 1-650Kva, Gen 2-725Kva
i applied for c licence with my one year apperents trainee and i have attaced with A grade contractor company experiance that is for 14 monts experiance this document is sufeicant for c licence? pls tell why they rejected