Answer Posted / syed vikhar ahmad
power factor is not constant it varies in different load
thats why manufaturer can not keep the rating in kw.suppose
the transformer rating is 500 kva we can put 500 kw load at
unity power factor but at .8 power factor we can put only
400 kw load as per formula kw= kva* pf
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Why did lightening arrestor solid copper rod head is sharp on mobile tower top?
following are the questions asked in interviews: 1) Considering the short circuit fault, which switchgear is preferable, SFU OR MCCB? Which operates faster? whicg one is popular in Indian Market and why? 2)Define SCPD. What is type2 coodination? 3)Why the contactor rating is higher for the fuseless selection than for fuse selection? whether the ratinf of SFU or MCCB remains the same in both the cases? 4)If the HP rating is known then can you calculate the ratings of L.V Switchgear(SFU/MCCB, contactor, OLR) without using the selection chart?
what is the reason for indication of light in the earth lamps of main switchboard.if there is an earth why does one lamp get dim and the other two bright.
How will polarity test of Dy5 Transformer ?
tell me about eletrical contractor
WHY L-G FAULT IS MORE SEVERE IN TERMS OF RRRV?
Could u pls tell me the NPCIL electrical engineering interview questions for Executive trainee, and also guide me how to face the interview.
what are the industrail measures to over ferranti effect? how would the ferranti effect the power system if those remedial mearsure arent taken? how often does this effect occurs in real power system?
there are cam operated switches - why we call cam operated , What is cam ?
Write down the name of 2 lady Bir Pratin of Bangladesh
explain single phase series motor
what is the minimum pay scale for electrical engineer (building construction)in kuwait? plz revert back with yrs of experience & pay scale respectively.
why u r living from presentaly working.
Is there any type of starter for DC motor other than two point,Three point and Four point starters?
What are the specifications for getting approval of Substation?